Project scale
6 elevators across 3 delivery groups.
A 6-elevator project across 3 delivery groups in Khobar using MR systems with 6 and 9-stop configurations, with works ranging from cabin-and-machine installation to completed scopes.
The Khobar portfolio includes higher stop counts than several other project groups, reaching up to 9 stops. Execution stages also vary significantly between elevators within the same portfolio.
The following details reflect the recorded specifications and execution status of this project group.
6 elevators across 3 delivery groups.
Configurations span 6 and 9 stops.
The recorded system is MR with a machine room.
Works range from cabin-and-machine installation to scopes recorded as completed.
Share your building requirements, number of elevators and location. The Builtech team will review the project needs and define the appropriate delivery scope.