Builtech Elevators
Builtech Projects · Dammam

4 Two-Stop Elevators in Dammam at the Rails and Doors Stage

A Dammam project covering 4 elevators within one delivery group, using MR two-stop configurations and currently recorded at the first-stage rails-and-doors installation phase.

Project media
City Dammam
Project type Ongoing multi-elevator project
Elevator type MR machine-room system
Elevators 4
Stops 2 stops
Status Stage 1: rails and doors
Project information is presented at a general level. Customer identity, contract numbers, financial data and precise site details are not published.
Project Detail

4 Two-Stop Elevators in Dammam at the Rails and Doors Stage

This project is distinctly different from the completed and handover-stage portfolios because it remains in the early installation cycle. All elevators use two-stop MR configurations and current works focus on rails and doors before subsequent stages.

Project delivery and execution scope
Project Signature

What defines this project?

The following details reflect the recorded specifications and execution status of this project group.

Project scale

4 elevators within one delivery group.

Stops

Each elevator is recorded with a two-stop configuration.

Technical system

The recorded MR configuration includes a 130×94 cabin and 180×150 shaft.

Execution status

All four elevators are currently recorded at the first-stage rails-and-doors phase.

Project media can be added from the media library
Start your project with Builtech

Planning an elevator project?

Share your building requirements, number of elevators and location. The Builtech team will review the project needs and define the appropriate delivery scope.