Project scale
34 elevators distributed across 6 delivery groups within one project portfolio.
A broad project portfolio covering 34 elevators across 6 delivery groups in Dammam, with 3, 7, 8 and 9-stop configurations and works ranging from rails and doors through final handover and operation.
This portfolio does not represent a single building. It covers multiple delivery groups totaling 34 elevators. Different stop counts, dimensions and execution stages reflect varied site requirements while remaining within Builtech’s supply, installation and technical delivery cycle.
The following details reflect the recorded specifications and execution status of this project group.
34 elevators distributed across 6 delivery groups within one project portfolio.
Elevator configurations vary across 3, 7, 8 and 9 stops depending on each delivery scope.
The portfolio uses MR machine-room systems with varying cabin dimensions and door openings.
Current works range from the initial rails-and-doors stage to elevators that reached final handover and operation.
Share the project requirements, number of elevators and location. The Builtech team will review the requirements and define the appropriate delivery scope.