Builtech Elevators
Builtech Projects · Riyadh

10 Elevators in Riyadh with Four-Stop Configurations

A 10-elevator project across two delivery groups in Riyadh, using four-stop MR machine-room configurations with final handover and operation recorded within the execution data.

Project media
City Riyadh
Project type Multi-elevator project across two delivery groups
Elevator type MR machine-room system
Elevators 10
Stops 4 stops
Status Reached handover and operation stage
Project information is presented at a general level. Customer identity, contract numbers, financial data and precise site details are not published.
Project Detail

10 Elevators in Riyadh with Four-Stop Configurations

This project is characterized by a consistent four-stop configuration across two principal delivery groups. The use of MR systems provides a common mechanical approach while cabin details vary according to individual elevator requirements.

Project delivery and execution scope
Project Signature

What defines this project?

The following details reflect the recorded specifications and execution status of this project group.

Project scale

10 elevators across two delivery groups.

Stops

All elevators are recorded with four-stop configurations.

Technical system

The recorded elevator system is MR with a machine room.

Execution status

Recorded execution data indicates final handover and operation stage.

Project media can be added from the media library
Start your project with Builtech

Planning an elevator project?

Share your building requirements, number of elevators and location. The Builtech team will review the project needs and define the appropriate delivery scope.